Full Design, Manufacture and Installation Service

11 November 2016

Heywood Timber Engineering recently manufactured and installed full timber frame packs including I-Beams and Rooftrusses for a scheme of 5 houses in Kirkheaton, Huddersfield.


The high-quality scheme is joint venture between KLH Projects and Eastwood Homes. It includes five three storey properties on a private drive with fantastic far reaching views over the local countryside.
“We have used Heywood Timber Engineering on our last project and yet again they have provided an excellent product and delivered    on-time. We use timber frame because of ease of build, the level of quality we can deliver and of course reduced construction time.
Heywood Timber Engineering came to site and erected all five timber frame packs in just over two weeks. We would always use timber frame on future jobs”


Jeremy Horton, Managing Director, KLH Projects


More details on this and other similar schemes can be found at -
http://www.klhprojects.co.uk
http://www.eastwoodhomes.co.uk

Quick Enquiry